![]() |
| SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website |
PART one - GENERAL
1.1 DESCRIPTION
of labor
A. The extent of website} clearing is shown
on the drawings and includes all site clearing activities needed to put in new
facilities, infrastructure and plant at the locations indicated.
1.2 JOB
CONDITIONS
A. Protection of Existing Improvements:
1. offer
protections necessary to stop injury to existing enhancements indicated to stay
in situ.
B. Salvable Improvements:
1. fastidiously
take away things indicated to be salvaged and create disposition as follows:
1.3 QUALITY
ASSURANCE
![]() |
| SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website |
A. Ministry of Transportation of Kingdom of
Saudi Arabia Specifications for Roads and Bridges:
1. Section 2.01: Clearing and Grubbing
2. Section 2.06: Removal of structures and Obstructions
3. Section 2.08: Disposal of Surplus Material
PART two - product
2.1 NOT
APPLICABLE.
PART three - EXECUTION
3.1 SITE CLEARING
![]() |
| SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website |
A. General:
1. take away such things on the
positioning or premises as specifically indicated.
2. aside from
things united to by Owner to be allowed to stay in situ, take away vegetation,
enhancements, or obstructions busy with installation of latest
construction. Removal includes any
concrete, stumps and roots.
B. dirt (Salvageable):
1. dirt is
outlined as fairly freed from soil, clay lumps, stones, and alternative objects
over seventy five millimeter. in diameter.
2. Strip soil
to no matter depths encountered in an exceedingly manner to stop intermingling
with the underlying soil or alternative objectionable material.
3. Stockpile
dirt in storage piles in areas for later use or wherever otherwise
directed. Construct storage piles and
canopy storage piles if needed to stop crooked dirt.
4. get rid of dirt as such as herein.
C. Clearing and Grubbing:
![]() |
| SITE CLEARING, QUALITY ASSURANCE, SURFACE SOIL, SALVAGEABLE, CLEARING AND GRUBBING, REMOVAL OF IMPROVEMENTS, JOB CONDITIONS, Protection of Existing Improvements www.hvacmep.website |
1. Clear the
positioning of shrubs and alternative vegetation. fully take away stumps, roots
and alternative scrap jutting through the bottom surface.
2. Fill
depressions caused by clearing and grubbing operations with satisfactory dirt
material unless any excavation or bulwark is indicated. Place fill material in
horizontal layers not prodigious a hundred and fifty millimeter. loose depth,
and completely compacted to a density adequate adjacent original ground.




No comments:
Post a Comment
Please do not enter any spam link in the comment box