FUNCTIONAL SPECIFICATION
FOR
TERMINAL MANAGEMENT SYSTEM
(TMS)
3.1 Control Room (Operations, Maintenance and Engineering
or OME Building)
3.2 Server Room (OME Building)
3.4 Satellite Instrument Building (S. I. B.)
3.5 Bill Of Lading Printers (BOL)
3.6 Tank Truck [Loading/ Unloading] Rack
4.0 TMS SITE INSTALLATION REQUIREMENTS
4.5 Internal Building Equipment
4.6 Connection to other suppliers Systems
5.0 SATELLITE INSTRUMENT and Printer Building
Specification
5.4 Uninterruptible Power Supply (UPS) Systems
5.6 Air Conditioning and Heating
6.11 Spare Capacity and Expansion Capability
7.0 TMS SystemS SpecificationS
7.3 BOL/ Delivery Receipt Printers
7.4 Local Area Network (LAN) & Wide Area Network (WAN)
7.6 Programmable Logic Controller (PLC)
7.7 Emergency Shutdown System (ESD)
7.9 Driver Interface Device (DID)
7.12 Uninterruptible Power Supply (UPS)
8.2 Loading and Unloading Preset Controllers
8.3 Custody Pipeline Metering And Proving Control Systems
(CPMPCS)
8.4 Automatic Radar Tank Gauging Inventory System
8.5 Fire Detection and Alarm System
8.7 Truck Identification System (TIS) (If it is Available)
8.8 Driver Verification System (DVS) (If it is Available)
8.9 Oily Water Collection and Treatment
9.6 Facility Monitoring and Control
10.0 TMS TO SAP Interface SpecificationS
11.0 TMS TO PI Interface Specifications
14.3 Hardware Build Specification (HBS)
14.4 Architectural Design Specification (ADS)
14.5 Module Design Specifications (MDS)
14.6 Functional Design Specification (FDS)
14.7 Original Equipment Manufacturer (OEM) manuals
14.10 Module Test Specification
14.11 Hardware Test Specification
14.12 Pre-Factory Acceptance Test Specification
14.14 Factory Acceptance Test Specification
14.15 Installation and Checkout Specification
14.16 Site Acceptance Test Specification
14.18 System Configuration Procedures
14.19 Software Modification and Development
15.1 Test Planning and Performance
15.3 Bought-in Equipment Testing
15.5 Pre-Factory Acceptance Test
15.8 Factory Acceptance Test (FAT)
15.9 Installation and Checkout Plan
20.0 TOOLS, TEST AND CALIBRATION EQUIPMENT
APPENDIX A: ACRONYMS AND DEFINITIONS
APPENDIX B: APPLICABLE DOCUMENTS
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) PART 1 OF 3
1.1
PURPOSE
1.1.1
The purpose of this
specification is to define the minimum functional and technical requirements
for the Terminal Management System(s) (TMS)
required for […] <INSERT
PROJECT TITLE>.
1.1.2
The systems shall be
designed to provide product receipt and distribution (by tank truck, and
pipelines), product inventory, reconciliation, and plant equipment monitoring
and control.
1.1.3
The systems shall
establish an integrated product measurement and accountability tool with the
capability of communicating all site transaction's process data with the
remotely located host computer system provided by others.
1.1.4
This document together
with the project specification for Scope of Work and the referenced HVACMEP.SITE
standards, material specifications and project specifications shall be used to
define the specific requirements of the TMS required for […] <INSERT PROJECT TITLE>.
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) PART 1 OF 3
1.2
FACILITIES DESCRIPTION
1.2.1
The Facilities
description, process description, plant overview, plant operating philosophy
and risk area definition shall be as specified in the project specification for
Scope of Work and the project specification for Process Control Systems.
1.3
ACRONYMS & DEFINITIONS
1.3.1
When used in this or
referenced documents the following words are used in the manner described
below:
·
‘SHALL’
and ‘MUST’ are used in the imperative sense.
·
‘WILL’ is
used in the preferred sense.
·
‘MAY’ is used in a permissive sense
to state authority or permission to do the act prescribed or provide the
function being defined in the prescribed manner, and the words ‘no person
may….’ Or ‘a person may not….’ mean that no person is required, authorized,
permitted to do the act prescribed, and the words ‘a… may not ….’ mean that the
item being described is not required, authorized, or permitted in the
prescribed manner.
·
‘INCLUDE(S)’ means ‘includes but
not limited to’.
·
‘COMPANY’ means a HVACMEP.SITE
organization (CONTRY NAME Services COMPANY, CONTRY NAME Overseas COMPANY, HVACMEP.SITE)
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) PART 1 OF 3
·
‘CONTRACTOR’ means LSTK contractor
or EPC contractor depending on the procurement method selected for the
project. There may be more than one
CONTRACTOR involved in the project. In
this case, the term CONTRACTOR refers to all applicable contractors.
·
‘VENDOR’ means the company
providing the system to which this specification is applicable.
1.3.2
See Appendix A of this
document for acronyms and definition of terms used in this document.