SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC
SOIL TREATMENT FOR
white ant management
PART one - GENERAL 1.1 DESCRIPTION
of labor A. The work of this section includes
pre-construction soil treatment for preventive management of subterranean
termites in buildings. B. The scope of labor includes however
isn't restricted to the procurance of all materials when acceptable approval by
the Owner, temporary storage consistent with the manufacturer's
recommendations, excavation and alternative necessary website preparation,
application of answer, sampling and testing, safety, disposal of venturous
waste, and close up of space propaedeutic to any construction. 1.2 SUBMITTALS A. Submit makers technical knowledge
sheets for materials and specific application directions for review and
approval before commencement of the work. 1.3 QUALITY
ASSURANCE A. applier Qualifications 1. The work
of this section shall be performed by a contractor certified by the Ministry of
Agriculture in tormentor management with a minimum of 5 years expertise in
similar work. Qualifications of the
applier shall be submitted for review and approval by the Owner. B. review and check set up 1. Submit
for review and approval a Soil Treatment review AND check set up (ITP)
reflective the wants of those specifications and approved submittals before
commencement of construction. 2. The ITP
shall address sequence, methodology and management of application and criteria
for acceptance of labor. 3. The ITP
shall embody procedures for sampling and testing of the soil by chemical
extraction to see the content of the termiticide answer residual within the
soil before and when treatment. The results of those tests shall represent the
management sample. Sampling Associate in
Nursingd testing shall be done by an freelance Testing Laboratory approved by
the Owner. 4. The
Contractor shall submit a layout of the world to be treated counteracted into
individual check AREAS. check AREAS shall be restricted to the world for every
kind of check listed below, and area unitas that aren't contiguous to and are
separated from alternative spaces aren't to be combined for check area
calculations. every check space shall have sample and check locations chosen by
the Owner Representative and indicated on the layout when treatment and before
testing. 5. Sampling
Associate in Nursingd testing of every check space shall be performed by an
freelance check Laboratory as follows: a. one check
per every 250 square metre space beneath the block on grade. b. one check
per every fifty square metre space of vital areas beneath the block on grade. c. one
check per seventy five linear meters per thirty cm elevate at perimeter of
concrete and/or solid masonry unit footings and foundations. 6. If any
initial check fails, 3 further retests shall be taken within the same check
space, at locations directed by the Owner.
If any of the 3 retests fail, the complete check space, shall be people
and retested in compliance with this specification and also the approved
ITP. If all 3 tests pass solely the
situation of original failure shall be people and retested. 7. The
Contractor are allowed the choice to entirely or partly retreat the check space
between initial tests and retests beneath the observation of the Owner. Such retreatment won't preclude any
retreatment needed by this specification within the event of unsuccessful
results when retesting. 8. The ITP
shall need a written technical proposal for preparation and check ways of
management samples from the categories of fabric to be treated. The management samples shall be ready and
tested by the freelance Laboratory beneath the observation of the Owner. The check results obtained from the treated
management samples shall be the idea for acceptance or rejection of the work.
the factors for acceptance is as follows: a. Any
initial check result that is a smaller amount than ninetieth of the results of
the individual management sample shall be thought of to fail. b. Any
retest result that is a smaller amount than ninety fifth of the results of the
individual management sample shall be thought of to fail. 1.4 SAFETY A. The Contractor shall post warning
signs in Arabic and English in areas of application to tell staff and also the
public that venturous soil treatment (poison) has been applied. take away signs
only treated area unitas are adequately lined by concrete. B. The Contractor shall treat all empty
containers and alternative contaminated materials as venturous waste and
properly dispose in selected areas. Keep
all such waste in one space, marked as venturous (poisonous) material till it
are often properly disposed. don't enable such material to become mixed into
alternative trash or waste materials. C. staff shall wear protecting article of
clothing and alternative equipment counseled by the manufacturer. D. additionally to necessities listed,
the Contractor shall go with all safety recommendations created by the
manufacturer or needed by the Owner. 1.5 WARRANTY A. The Contractor shall furnish a written
pledge certifying that the applied soil termiticide treatment can stop
infestation of subterranean termites for a amount of 10 (10) years from the
date of initial acceptance, signed by the Contractor and also the applier. B. The pledge shall need the Contractor
to produce further treatment if there's any proof of white ant infestation
throughout the pledge amount. further treatment are applied in compliance with
Owner specifications for post-construction white ant treatment. C. The pledge shall additionally need the
Contractor to repair to the satisfaction of the Owner or furnish equal or
higher replacements for injury caused by white ant infestation throughout the
pledge amount. PART two -
merchandise 2.1 MANUFACTURER A. planned
product: Subject to compliance with native laws and necessities merchandise
that will be incorporated within the work embody , however not restricted to
the following: 1. Biflex
T.C. :- Bifenthrin based mostly Supplier: 2. Or
approved equal. 2.2 MATERIALS A. General: Use AN emulsible, focused
termiticide that dilutes with water, specially developed to stop termites
infestation and will not cause pollution
to the setting or toxity to the plantation. fuel shall not be permissible
diluents. Offer an answer consisting of 1 of following chemical B.
Environmental friendly product.
1. Low human toxicity . 2. Low odour . 3. No skin irritation . 4. Low pressure . 5. Won’t lurk around your building. C. toxic
chemicals, E.P.A. and native territorial authority approved. D. Dilute as
suggested by the toxic manufacturer and approved by the E.P.A. and native
territorial authority and S.A.S.O. E. Certify
that toxic can don't have any harmful result on water proofing membranes,
coatings and alternative contact materials. PART three - EXECUTION 3.1 APPLICATION
GENERAL A. All application shall go with the
manufacturers’ recommendations as enclosed within the approved ITP. Application shall be created with an
occasional pressure power sprayer or a tank sort compression pesticide sprayer. B. don't apply soil treatment answer till
excavating, filling and grading operations area unit completed, except as
otherwise needed in construction operation.
Reapply soil treatment answer to areas disturbed by construction
operations following application of soil treatment termiticide answer. C. The Contractor shall make sure that no
wood or wood product area unit left within the fill. D. take away all foreign matter that
might decrease effectiveness of treatment on areas to be treated. Loosen, rake
and level soil to be treated, except antecedently compacted areas beneath slabs
and foundations. If concrete slabs cannot
be poured over soil a similar day it's been treated, a water-resistant cowl of
synthetic resin material shall be placed over the treated soil. Concrete shall be placed as shortly once soil
treatment as potential. Sampling and testing shall be administered promptly to
expedite putting of concrete. E. Application of termiticide answer
should be administered in such a way on offer AN unbroken vertical and horizontal
chemical barrier between the structures connected with the soil and white ant
colonies within the soil. 3.2 APPLICATION
LOCATION AND RATES A. beneath block on grade within
foundation walls: wherever fill is well stratified soil, apply four liters of
termiticide answer per one sq. meter of soil. wherever fill material is washed
gravel or alternative coarse sorbent material, apply six liters of termiticide
answer per one sq. meter of soil. B. At important area unitas beneath the
concrete block on grade within the building line: Areas enclosed are the within perimeter of
foundation walls, each side of interior partition walls on grade beams, the
perimeter of column footings, construction joints or enlargement joints in
slabs, the perimeter of plumbing pipes, electrical conduits or alternative
block penetrations. the world of treatment shall be thought-about to increase a
minimum of twenty cm on the far side these locations. Apply twenty five liters of termiticide
answer per centare of soil. C. At concrete and/or solid concrete
masonry unit footings and foundations: space of treatment shall be
thought-about to increase a minimum of twenty cm outside the perimeter of the
building line. Apply five liters of termiticide
answer per linear meter of trench to every thirty cm carry from bottom of
footing to prime of end grade on the whole outside perimeter of the
inspiration. For foundations but thirty
cm deep, a minimum depth of thirty cm from prime of end grade shall be
treated. Termiticide answer could also
be mixed with the fill soil because it is placed within the trench excavation
or sprayed onto the fill layer of a most thirty cm carry before compaction. D. At hollow core concrete masonry unit
foundations: additionally to the treatment higher than for footings and
foundations treat voids at a rate of eight liters of termiticide answer per
linear meter of foundation wall, sprayed into the hollow areas. |