METHOD STATEMENT
FOR CHILLED WATER PIPING
![]() |
| METHOD STATEMENT FOR CHILLED WATER PIPING PART 1 FOR PROJECT STANDARDS AND FOR PROJECT INSTALLATION DETAILS THA HOW TO DO INSTALLATION AND WORK |
METHOD STATEMENT FOR CHILLED WATER PIPING PART 1
TABLE OF
CONTENTS
C. ABBREIONS3
E. Responsibilities………………………………………………………………4-5
f. Tools / Equipment……………………………………………………………… 5-6
g. Material………………………………………………………………………………..6
H. Material Handling and Storage………………………………………...6-7
I. Installation General Requirements……………………………… …7
J. Chilled Water Piping Installation Procedure……………………..8-10
K. Insulation of Chilled Water Pipes …………………………………… 10-11
L. Pre-insulated Chilled water Piping Installation Procedure……...11-12
METHOD STATEMENT FOR CHILLED WATER PIPING PART 1
A. PURPOSE
The purpose of
generating this Method Statement is to define the procedure step by step
to implement the correct practices for Installation, Pressure Testing & Insulation of Chilled
Water Piping including valves and accessories through the guide line
contained herein so as to ensure that the job execution complies with the
requirements and serves the intended function to a satisfactory level.
B.
SCOPE
This Method Statement refers to various work procedures
contained within project control documents, which explains and covers the
Installation, Pressure Testing & Insulation of Chilled Water Piping
including valves and accessories.
ABBREVIATIONS Client
/ Owner : . HVACMEP
Contractor : EASTERN
TRADING & CONST. EST.
MS
|
:
|
Method Statement
|
HVACMEPIC
|
:
|
. HVACMEP Inspection Checklist
|
HVACMEPTR
|
:
|
. HVACMEP Test Report
|
HVACMEPTIP
|
:
|
. HVACMEP Typical Inspection Plan
|
HVACMEPES
|
:
|
. HVACMEP Engineering Standards
|
RFI
|
:
|
Request for Inspection
|
PID
|
:
|
Project Inspection Department
|
HVACMEPPMT
|
:
|
. HVACMEP Project Management
Team
|
ITP
|
:
|
Inspection & Test Plan
|
NCR
|
:
|
Non Conformance Report
|
PM
|
:
|
Project Manager
|
CM
|
:
|
Construction Manager
|
PPE
|
:
|
Personal Protective Equipment
|
QA/QC
|
:
|
Quality Assurance/Quality Control
|
METHOD STATEMENT FOR CHILLED WATER PIPING PART 1
D.
REFERENCES
UMC- Uniform Mechanical Code
HVACMEPES-HVACMEP-001-Heating, Ventilating and
Conditioning (HVAC)
HVACMEPES-HVACMEP-002-Air Conditioning System for
Essential Operating Facilities
HVACMEPES-HVACMEP-003-Air Conditioning System for
Communications Building
HVACMEPES-HVACMEP-100-. Hvacmep Mechanical (HVAC Code)
SMACNA-Sheet Metal and Conditioning Contractor
National Association
G.I-0425.000 Refrigerant Management
HVAC Layout
|
Material submittals Project Specification |
SHVACMEP-SPC
002 |
|
|
|
E. RESPONSIBILITIES
E.1 Construction Manager:
Responsibilities are to ensure the full
implementation of this method of statement and identify the requirements and
add on resources for the effective accomplishment of the activity and directly
supervise by leading a team. Site engineers, HVAC supervisors on the execution
and conformance of this procedure and to ensure that all site work is achieve
in a timely manner and on time and comply with all standards and specifications
requirements.
E.2 QA-QC Manager:
Is
responsible for coordinating the management of the project quality plan
including subcontractor if available. For successfully deliver the project. The
QA-QC manager report to the project director and responsible for. Ensuring
project plan system and procedure are established. Ensuring quality management
requirements are incorporate into project control, design, procurement, and
construction and commissioning.
E.3 SiteEngineer
The Site Engineer & Safety Advisor will ensure that all necessary safety and
protective equipment’s are provided along with the properly trained and
qualified personnel.
The Work Method Statement procedure is
to be followed
and
must observe
any hold points noted on the
HVACMEPTIP and notify HVACMEPPID for inspection.
Only trained and competent
peopleare to be involved in the activities
and use any of the equipment mentioned in the Method Statement.
The workers safety is of prime concern at delapre cautions will
betak to minimize the safety risks involved in every activity.
.
E.4 HVAC Supervisor:
Ensure
full compliance by all mechanical foremen, millwright, fetters, riggers and
labor regarding execution of the work in accordance with . HVACMEP STANDARD
project requirements and specifications. Confirm the availability of all
materials, tools, equipment, and required personnel who will carry out the
work. Conduct brief meeting with all
personnel involved in the installation of equipment.
E.5 Quality Control Inspector:
The
QC-Inspector shall be responsible for the implementation of the quality
procedures for this particular job. His responsibilities include but are not
limited to the following. Monitors daily activities, checks and assures that equipment
installation activity is in compliance with the approve standards
specification. Initiates RFI after verification for the required inspection.
Notifies the construction supervisor and QA-QC manager on corrective action
that has to be taken. Coordinates with required personnel for the required
testing on this work. Responsible for the preparation and submittal of the QC
documentation.
E.6 Safety Supervisor:
Check the
work areas for any unsafe conditions. Ensure that all safety requirements have
been adequately addressed and the work shall be carried out in accordance with .
HVACMEP G.I-0002.102 project safety procedures. Ensure that the tools and
equipment to be used.
E.7 Engineering Department:
Generate
relevant documents from manufacturer or vendor and the method statements for
each individual test and installation procedure, preservation in accordance
with the manufacturer instruction procedure.
F. TOOLS / EQUIPMENT
F.1 Fork Lift or Crane with
capacity & arrangement in line with the
Manufacturer’s recommendations, pallet mover and as required at site.
F.2 Hydraulic Trolley
F.3.Portablehandtools.
F.4. Portable Drilling Machine/ Grinding Machine & Angle Cutter.
F.5. Spirit Level / Level Threads
F.6. Step Ladder
F.7. Scaffolding with
platform.
G . MATERIALS
Chilled Water Piping and accessories
shall be in line with the approved material submittal.
* Pipes:
Carbon Steel Pipes – 50 mm and smaller (ASTM
A 53-90b, Sch-40, Grade A or B) Threaded Ends
Carbon Steel Pipes – 65 mm and larger
(ASTM A 53, SCH 40, Grade A) Butt welded ends.
* Fittings:
Threaded
Fittings – 50 mm and smaller ″ (ASMEB 16.3) black malleable iron screwed
Butt Welded Fittings – 65mm and larger (ASME B 16.9) butt welding wrought iron
fittings.
* Valves:
Up to 50 mm: Thread ends
65 mm and above: Flanged ends
* Accessories:
Pressure gauges, thermometer, test points, air vents, etc.
H. MATERIAL HANDLING &
STORAGE
On receipt of the Chilled
Water Pipe and accessories at site, necessary precautions shall be taken
for unloading, shifting & storage, as follows:-