PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND
MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS QUALITY ASSURANCE SUBMITTAL SIGN
MATERIALS EXECUTION RELATED REQUIREMENTS CONTRACTOR'S OFFICE
 |
| PROJECT IDENTIFICATION AND SIGNS FURNISH, INSTALL, AND MAINTAIN TEMPORARY ON-SITE INFORMATIONAL SIGNS QUALITY ASSURANCE SUBMITTAL SIGN MATERIALS EXECUTION RELATED REQUIREMENTS CONTRACTOR'S OFFICE |
PROJECT IDENTIFICATION AND SIGNS
PART one - GENERAL
1.1 REQUIREMENTS
A. Furnish, install, and maintain:
1. Project
Identification Sign(s)
2. Temporary
on-the-scene informational signs
B. Contractor shall place no totally
{different|completely different} signs or advertisements on the premises except
for warnings and different signs required by laws and ordinances.
1.2 PROJECT
IDENTIFICATION SIGN(S)
A. Contractor shall provide at each separate
approved work web site a symbol indicating the presence of the individual
Contractor. the location shall be lighted and of high public visibility,
adjacent to the foremost entrance to web site, as approved by the Owner.
B. The sign(s) shall be a try of.8 m high x
3.0 m wide. vogue for these sign(s) shall be as shown on the project
identification board commonplace drawing vary RC-GE-002. to boot among the
Owner General commonplace and Technical pointers.
C. knowledge on the sign(s) shall be as shown
on Project Identification Sign Board below commonplace drawing vary
RC-GE-002. The sign shall be in Arabic
and English.
D. Graphic vogue, type of inscription, and
color as elite by Owner.
1.3 INFORMATIONAL
SIGNS
A. provide signs at locations to clearly
indicate the facilities and key components of the work.
B. Size of signs and inscription as
applicable to usage.
C. Graphic designs, type of inscription and
hues as hand-picked by the Owner General commonplace and Technical pointers.
1.4 QUALITY
ASSURANCE
The painter
shall have hot experience in type of work required.
1.5 SUBMITTAL
The
Contractor shall submit the design and a locations of all signs to the Owner
for approval before installation.
PART a try of - merchandise
2.1 SIGN
MATERIALS
A. Structure and Framing: is additionally new
or used, wood or metal, in structurally sound condition, and applicable for
such finish.
B. Sign Surfaces: Exterior softwood plywood with medium density
overlay, commonplace large sizes to attenuate joints. Thickness up to span framing members and to
provide even swish surface whereas not waves or buckles.
C. Rough Hardware: Galvanized.
D. Paint:
Exterior quality, up to resist weathering and attenuation throughout the
contract quantity.
PART 3 - EXECUTION
3.1 SIGNS
A. Construct and install project
identification signs in accordance with the approved vogue.
B. Install informational signs at a height
for optimum visibility; on ground mounted poles or connected to temporary
structural surfaces.
C. Paint exposed surfaces of supports,
framing and surface material; one coat of primer and one coat of exterior
paint.
D. Paint Exposed Surfaces: One coat of primer and one coat of paint.
E. Paint graphics in styles, sizes, and hues
elite.
3.2 MAINTENANCE
A. Maintain signs and supports throughout a
neat, clean condition; repair any damages to structure, framing or sign.
B. Relocate informational signs professional
re nata by progress of the work.
3.3 REMOVAL
A. subtract signs, framing, supports, and
foundations at completion of the work.
FIELD OFFICES AND SHEDS
PART one – GENERAL
1.1 REQUIREMENTS
engulfed
A. Furnish, install and maintain temporary
field offices throughout entire construction quantity.
B. Furnish, install and maintain storage
sheds required for construction through Initial Acceptance.
C. Contractor
must submit plans/lay-out for Field geographic point and Sheds for Owner
approval.
D. Removal of
field offices, storage sheds and their contents as directed by the Owner.
E. provide
bilingual secretary to support project documentation activities
at the Owner Construction geographic
point
1.2 RELATED wants
A. Section:
Contractor Use of Premises
B. Section:
Temporary Utilities and Facilities
1.3 OTHER wants
A. before installation of offices and sheds,
get the approval of the Owner in accordance with the operating papers wants
engulfed in Section1017.
1.4 CONSTRUCTION
wants
A. General:
1. Facilities
shall be structurally sound, weather tight, with floors raised on prime of
grade.
2. Thermal
Transmission Resistance: Compatible with
occupancy and storage wants.
3. At
Contractor's chance, transferrable buildings or mobile homes, that area unit
modified for geographic point or storage use, is additionally used.
4. Permanent
facilities shall not be used for field offices or for storage.
1.5 CONTRACTOR'S
geographic point
A. Size: professional re nata for general
use and to provide house for project conferences.
B. Furnishings in Meeting Area:
1. table and
chairs for a minimum of eight persons
2. Racks and
files for Project Record Documents in, or adjacent to, the meeting house
C. completely different Furnishings: Contractor's chance
D. Lighting and Temperature Control: Contractor's chance
E. Telephone: One direct line instrument, minimum
F. One 10 in. (250 mm) outdoor-type
measuring device
1.6 CONTRACTORS
STORAGE SHEDS
A. To wants of various trades
B. Dimensions: Sized for storage and handling of
merchandise.
C. Ventilation: go with such and code wants
for merchandise keep.
D. Air Conditioning: Provided to stay up temperatures per
individual sections for the merchandise keep.
PART a try of – merchandise
2.1 MATERIALS,
instrumentation AND FURNISHINGS
A. Materials, instrumentation and furnishing
ought to be new and adequate for required purpose and will not violate
applicable codes or laws.
PART 3 – EXECUTION
3.1 PREPARATION
A. Fill and grade sites for temporary
structures to provide surface evacuation.
3.2 INSTALLATION
A. Construct temporary field offices and
storage sheds on correct foundations, provide connections for utility services.
3.3 MAINTENANCE
AND cleansing+ A. The Contractor shall provide daily
maintenance and cleansing for all temporary structures, furnishings and
instrumentation, at the side of services.