FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4
points as Shipment Inspection and Testing Fire Detection Circuit Ground Safety Ground Connections and Termination Raceways and Supports Circuit Segregation Wire Color Code Power Cable Specification Wiring Methods
![]() |
| FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4 |
1.1.1 Wiring strategies
5.12.2.1 cable Specification
The incoming power cables and therefore the interconnecting
cables between instrumentation within the SIB and metal shall suits the
National electrical Code (NFPA 70). The
cables shall be rated 600V, shall have a minimum temperature rating of 90°C
dry/75°C wet, and shall change to UL Standards in line with the actual sort
(e.g. UL 1277, together with its vertical receptacle flame take a look at, for
sort TC cables, UL eighty three for THHN/THWN and UL forty four for XHHW). For wiring the lighting that need higher
temperature wires and cables, the higher than minimum temperature ratings shall
be exaggerated consequently.
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4
Power and management conductors shall be stranded
copper. Stranding shall be ASTM B8
category B or C.
Conductor sizes shall be in accordance with the National
Electrical Code (NFPA 70).
Power wiring shall be color coded as follows:
AC Supply:
Phase Black;
Neutral White;
Ground inexperienced or inexperienced with yellow traces
DC Supply:
Positive
Red or red sleeve over any color except green;
Negative Black or black sleeve over any color except
inexperienced
5.12.2.3 Circuit Segregation
Minimum separation distances between parallel runs of
various signal varieties shall suits IEEE 518.
5.12.2.4 Raceways and Supports
Power and management cables shall be set in cable trays,
metal wire trough or conduits fixed to the building walls or ceiling. Electrical golden tube (EMT) is suitable to
be used for the lighting circuits.
Channel erector system elements (Unistrut or equivalent) wont to support
conduits, cable trays, lighting and different electrical instrumentation shall
be manufactured from hot-dipped galvanized steel.
Cable trays shall be copper-free metal, ladder sort.
5.12.2.5 Connections and Termination
Compression (crimped) sort connectors shall be used for
terminating stranded power or management conductors. the employment of solder
lugs is prohibited. Compression
connectors for a hundred and twenty mm2 and bigger conductors shall be two-hole
NEMA style. All compression
instrumentalitys for ten mm2 and bigger conductors shall have a manufacturer's
compression die variety and conductor size written or sealed on the connector. All compression connectors shall be preserved
copper. Spring pressure sort twist-on
connectors, pressure set screw connectors with insulating caps ar allowed for
lighting and receptacle circuits.
5.12.2.6 Building Cable Entries
The TMS vender shall offer appropriate secretory organ
plates sized and settled to accommodate all incoming and outgoing instrument
and cable entry through the building walls.
The secretory organ plates are trained and therefore the cables glanded
at website. Adequate house among the
buildings shall be provided to permit for cable actuation. The approximate most cable bend radius are
zero.5m.
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4
5.12.2.7 External
Cable receptacle
Cabling to the SIB and PB's can typically be run underground
and sealed at a stub-up (by others). The
cables are run (by others) into the SIB and PB's via external wall mounted
cable receptacle.
The TMS vender shall offer and mount the outwardly mounted
cable receptacle, that shall be sized and settled by the TMS vender to
accommodate all incoming and outgoing instrument and power cables.
1.1.2 Grounding
Grounding of apparatus shall be in accordance with the
grounding specifications of the National Electrical Code (NEC), Article 250.
management cupboard grounding shall suits the fabric specifications of
34-SAMSS-820.
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4
5.12.3.1 Safety Ground
All exposed non-current-carrying golden elements that might
become energised with risky potentials should be dependably connected to the
instrumentation grounding circuits. All
metal instrumentation and enclosures among a panel or series of panels (i.e.
instrument cases, hinged doors, racks, etc.) shall be secured with bonding
jumpers and connected to a security ground bus with copper wire with four mm2
cross-sectional space. the security ground bus shall connect with the security
ground grid with twenty five mm2 copper wire as a minimum, in an exceedingly
closed-loop system configuration. Safety
ground connections should be created such once a case-grounded instrument is
removed, the integrity of the remainder of the security ground system is
maintained.
5.12.3.2 Circuit Ground
An instrument circuit ground bus shall be provided for
consolidating instrument signal commons and cable defend drain wires. This ground bus shall be isolated from the
security ground system and different golden elements.
Each instrument signal common shall be connected to the
isolated instrument ground bus with copper wire sized to hold the expected
fault current or one.5 mm2 , whichever is larger. 2 ground lugs for twenty five
mm2 cables shall be put in within the ground bus for association to the plant ground
grid.
The TMS VENDOR's counseled grounding theme for the provided
instrumentation shall be submitted for HVACMEP.SITE's approval.
1.2 Fire
Detection
The SIB and metal shall every be furnished with 2 ionisation
sort smoke detectors. The detectors
shall be settled strategically at the ceiling of the building and put in in
accordance with the wants of NFPA seventy two.
Detectors shall be terminated at a junction box mounted on the within
wall. The detectors shall use voltage
and RF transient suppression techniques to attenuate false feat.
1.3 Inspection
and Testing
All TMS instrumentation settled during this building shall
be subject to testing as per the Technical Specification Terminal Management
System.
The building and instrumentation shall be inspected by
HVACMEP.SITE in line with the examination demand Sheets (see APPENDIX B).
FUNCTIONAL SPECIFICATION FOR TERMINAL MANAGEMENT SYSTEM (TMS) part 4
1.4 Shipment
Prior to cargo, all original shipping stops, bolts, ties, etc.,
shall be reinstalled altogether such affected devices. The TMS vender shall install further
protection PRN to forestall harm throughout shipping. All external devices (i.e. lights) shall be
removed for cargo. appropriate weather tight cowl shall be provided and put in
on all openings exposed by instrumentation removal.
Lifting lugs shall be provided within the construction of
the SIB and metal.
All openings shall be lined to forestall entrance of
contaminants throughout transit.
The TMS vender shall prepare all instrumentation for cargo
in accordance with the manufacturer's directions.
The TMS vender shall show clearly on his drawings any
re-assembly needed once shipping.