Air Conditioning and
Heating
Design of the air
conditioning systems shall utilize the environmental conditions specified in
engineering specifications MEPHVACS-A-112.
Each Heating and Air
Conditioning unit shall be sized by the TMS VENDOR based on an indoor ambient
temperature of 29°C unless otherwise required by the TMS VENDORS supplied
equipment. HVAC load calculations shall
be in accordance with ASHRAE Handbook methods and shall not include more than
10% overall excess capacity due to safety factors or reserve capacity
requirements. The residential method
shall not be used.
Air-conditioning
units shall be wall-mounted with heating capability and shall be rated at 208
volts, 3-phase. Power supply shall be
from the Auxiliary Equipment Distribution Panel. The TMS VENDOR shall submit a detailed layout
drawing showing the location for HVACMEP.SITE's approval.
The TMS VENDOR shall
design and locate the air conditioning units in such a way that it shall not be
possible for any condensation to affect any TMS or other electrical equipment.
1.1.1
Satellite Instrument
Building
The SIB shall be
supplied with two 100% capacity units.
1.1.2
Printer Building
The PB shall be
supplied with one 100% capacity units.
1.2
Molded Case Switch
The molded case
switch shall be 3-pole, 100 Amp. rated disconnect switch capable of opening the
circuit at design load.
1.3
Service Transformer
The Service
Transformer shall be dry-type, indoor, rated.
The Service
Transformer shall have the following features:
·
Sealed insulation;
·
Noise level shall not exceed those listed in ANSI Standard C89.1 for
the size transformer;
·
A minimum two voltage taps - 2½% below normal voltage and two voltage
taps - 2½% above normal voltage;
·
The transformer case and neutral shall be grounded.
1.4
Distribution Panelboards
All distribution
panelboards shall be as follows:
·
Comply with NEMA PB1 and UL 67;
·
Main circuit conductor system shall be copper;
·
A minimum of 10% spare breakers shall be required;
·
Breakers shall have a minimum trip rating of 20A;
·
Breakers operating at greater than 240 Volts shall be equipped with
pad-lockable lock-off devices;
·
For panelboards which provide branch circuits operating at
phase-to-neutral voltage levels, a neutral bus shall be provided within the
panelboard;
·
A ground bus shall be provided within the panelboard;
·
Branch circuit breakers shall be plug-in style;
·
Fuses shall be fast acting Bussman type KTK or equal.
The load schedule for
loads other than those supplied by the TMS VENDOR will be provided by
HVACMEP.SITE prior to the TMS VENDOR's procurement of the panels. Sizing and selection of circuit breakers,
fuses and the line and neutral cables shall be by the TMS VENDOR in accordance
with the latest edition of NFPA 70 (National Electrical Code). The TMS VENDOR shall furnish time current
characteristic curves for all breakers and fuses supplied. Panel short circuit rating shall be 10 kA
minimum.
1.4.1
Main Distribution Panel
The Main Distribution
Panel shall be powered either directly from a 3-phase, 4-wire, 220/127 VAC
supply or from a 208/120 VAC service transformer output. One 3-pole main circuit breaker and 24
circuit breaker positions shall be provided.
1.4.2
SIB and PB Auxiliary
Equipment Distribution Panel
One Auxiliary
Equipment Distribution Panel shall be supplied, installed and wired at each of
the SIB's and PB's. The Lighting
Distribution Panel shall be powered with 220/127 VAC or 208/120 VAC, 3-phase,
4-wire supply from the SIB Main Distribution Panel. One 3-pole main circuit breaker and a minimum
of 12 circuit breaker positions shall be provided.
1.4.3
UPS Power Distribution
Panel
The UPS Power
Distribution Panel shall be powered by the UPS unit with 120 VAC, 1-phase,
2-wire plus ground supply. One 1-pole
main circuit breaker and a minimum of 12 circuit breaker positions shall be
provided.
1.4.4
UPS TMS Equipment
Distribution Panel
One UPS TMS
Equipment Distribution Panel shall be supplied, installed and wired at each
SIB. The panel shall be powered by the
UPS Distribution Panel with 120 VAC, 1-phase, 3-wire supply. A minimum of 12 fuse circuit positions shall
be provided.
1.4.5
UPS Instrument
Distribution Panel
UPS
Instrument Distribution Panel(s) will be supplied, installed and wired as required
at each site by CONTRACTOR. The panel
shall be powered by the UPS Distribution Panel with 120 VAC, 1-phase, 3-wire
supply.
1.5
Lighting
All lighting shall
be 120 VAC, 1-phase.
1.5.1
Interior Lighting
One light switch
shall be installed near the door on the inside.
The minimum luminance level shall be 100 lux at 760 mm above working
plane. The fixtures shall not use
Polychlorinated Biphenols (PCB) and shall be marked as "PCB free" by
the manufacturer.
1.5.2
Exterior Lighting
External lighting
shall be provided above each entrance door.
The fixtures shall be 100 watt high pressure sodium (HPS) lamps with
integral constant wattage ballast. These
lamps shall be controlled by a photoelectric cell with bypass switch. The bypass switch shall be located near the
door on the inside of building.
1.5.3
Emergency Lighting
All fluorescent lamp
fixtures shall be fitted with batteries, chargers and test push buttons to
operate at least two out of four lamps when AC power fails. Each unit shall have enough capacity to
provide illumination level of 100 lux at 760 mm above the floor for a minimum
of ninety minutes, while maintaining 87% of nominal voltage. The system shall switch to charging mode
automatically when the AC power is restored in the building.
1.5.4
Exit Sign
Exit signs shall be
provided inside the building over the door.
Exit lights shall be of emergency self-contained type with battery
charger, solid-state charger, automatic transfer in case of AC power failure
and red-stenciled panel. Exit signs
shall be written in English and Arabic.
1.6
Electrical Receptacles
One duplex
receptacle shall be supplied at each end of the SIB and the PB. Receptacles shall be 120 VAC, 3-wire, 20 Amp
rating.
1.7
Electrical Requirements
The electrical system
consists of all distribution panels, fuse boxes and associated cable entries
and wiring methods. Refer to Figure 3 and Figure 4 for the simplified typical one-line diagrams for the SIB and the
PB. These diagrams show the suggested
method of wiring within the SIB and PB
and are for guidance only. The TMS
VENDOR shall be responsible for all detailed design and for ensuring that the
wiring standards and practices referenced in this specification are followed.
1.7.1
Incoming Power Supply
Two 480 VAC, 380 VAC
or 220 VAC 3-phase, 4-wire circuits shall supply power to the SIB and PB. The TMS VENDOR shall submit detailed physical
drawings that show the location of cable terminals at the UPS assembly and the
service transformer. All sites are
supplied at 60 Hz.