TMS internal signal cabling, Field Mounted equipment, Internal Building Equipment, Connection to other suppliers Systems, Uninterruptible Power Supply System, Heating and Air-conditioning Units,
![]() | ||||||
Moulded Case Switch, Service Transformer, Bypass transformer, Electrical Distribution Panels, Smoke Detectors, Lighting Fixtures and Receptacles, Emergency Lights and Exit Signs, All Interior Wiring and tray work, Exterior tray workTMS VENDOR shall
install and terminate the internal instrument signal cabling. The TMS VENDOR
responsibilities shall include: ·
Installation the building ducting, cable tray, conduit, glands and
transits; ·
Installation of cables within the building; ·
Termination of cables; ·
Inspection of the installation; ·
Testing the installation TMS internal signal cabling, Field Mounted equipment, Internal Building Equipment 1.2
Field Mounted equipment
The Site Contractor
shall install all field mounted equipment: The TMS VENDOR
responsibilities shall include: ·
Inspection of equipment location before installation; ·
Supervision of installation; ·
Verification of correct installation. ·
Checking the power and signal cable routing; ·
Checking the equipment grounding and electrical protection; ·
Setup of equipment (hardware and software). ·
Testing the installation. TMS internal signal cabling, Field Mounted equipment, Internal Building Equipment 1.3
Internal Building Equipment
The TMS VENDOR shall
be responsible for the installation of all his equipment within buildings. The TMS VENDOR
responsibilities shall include: ·
Testing before installation; ·
Assembly; ·
Inspection of equipment location before installation; ·
Location; ·
Installation; ·
Connection to power and communications; ·
Equipment grounding and electrical protection; ·
Verification of correct installation; ·
Setup of the equipment (hardware and software). ·
Testing of the installation; TMS internal signal cabling, Field Mounted equipment, Internal Building Equipment 1.4
Connection to other suppliers
Systems
Where the TMS shall
connect to other suppliers systems the TMS VENDOR responsibilities shall
include: ·
Connection of the TMS LAN Control Network, where required, to the
system; ·
Verification of correct installation; ·
Setup and calibration of the TMS (hardware and software). ·
Testing all communications, self-diagnostics and TMS related functions.
SATELLITE
INSTRUMENT and Printer Building Specification This specification
defines the requirements for the design, engineering, fabrication, packaging,
shipping and delivery of Satellite Instrument Buildings (SIB) and Printer
Buildings (PB). This specification
shall be used for buildings housing TMS equipment supplied in accordance with
this Functional Specification. The TMS VENDOR shall
carry out the following activities in accordance with this specification and
referenced documents. ·
Design and fabrication of the SIB and Printer buildings; ·
Installation of TMS equipment in the SIB and Printer buildings; ·
Design, supply and installation of UPS ·
Design, supply and installation of auxiliary equipment/systems; ·
Testing of all equipment; ·
Delivery to site and checking of installation of building. Each SIB shall
contain TMS equipment as specified in section 3.4 In addition to the
above the TMS VENDOR shall provide power supply, air conditioning, fire
detection and lighting equipment which shall include but not be limited to the
following items: ·
Uninterruptible Power Supply System; ·
Heating and Air-conditioning Units; ·
Moulded Case Switch; ·
Service Transformer; ·
Bypass transformer; ·
Electrical Distribution Panels; ·
Smoke Detectors; ·
Lighting Fixtures and Receptacles; ·
Emergency Lights and Exit Signs; ·
All Interior Wiring and traywork. ·
Exterior traywork The TMS VENDOR shall
be responsible for all design, construction, testing and delivery in accordance
with this document.
1.5
Environmental Conditions
Design and
fabrication of the buildings shall consider the environmental conditions
specified in engineering specifications HVACMEPES-A-112. 1.6
Building Design
The TMS VENDOR shall
design the building based on the supplied equipment and accessories. The design shall include for anchoring of the
building in line with the supplied foundation drawings. The building shall have adequate space to
facilitate opening of doors, pull-out and insertion of the largest module/
assembly in the cabinet and access for maintenance and operations
purposes. Additional space shall be
allocated in some SIB's for a Tank Gauging Interface Cabinet to be supplied by
another VENDOR and installed by the Site Installation Contractor (dimensions to
be supplied during detailed design ).
Adequate space shall be allowed in all buildings for routing and
segregation of cables. Cable quantities
and dimensions shall be supplied during detailed design. All PB's shall have
one standard design and dimensions. SIB
design shall be standardized to reduce costs but different dimensions and
layouts are allowable where appropriate. The following diagrams Figure 1 and Figure 2 give possible equipment layouts and suggested,
approximate dimensions for SIB and PB.
The layouts and dimensions are for guidance only and it is the
responsibility of the TMS VENDOR to design the buildings to take into account
all factors. The TMS vendor shall be
responsible for marking up all foundation drawings with any changes. It shall be noted that as the PB's will be
located in the traffic pattern, minimization of size is a factor. The VENDOR shall
design and supply lugs to be used for erection work. Figure
1: Typical
SIB Layout Figure
2:
Typical PB Layout The building
structure shall be engineered, designed, fabricated and tested in accordance
with material specifications 12-SAMSS-014 (Pre-Engineered Metal
Buildings). The buildings walls, ceiling
and floors shall be fabricated of steel panels. All supplied
equipment shall be securely fastened to wall, floor or ceiling as appropriate. Flat concrete
foundations will be supplied for all buildings.
The TMS VENDOR shall be responsible for the design and supply of the
building anchoring and for the supply of installation instructions. Any modification required to the foundation
to allow for building anchoring shall also be specified by the TMS VENDOR in
the installation instructions. The occupancy
category of the building is Type IV - Standard Occupancy Structure as
referenced in Table 23-K of the Uniform Building Code (UBC). The following are
the maximum heat transmission coefficients (U):
Interior and
exterior wall and roof panels shall be pre-painted white completely. Floor design load
shall be provided by the TMS VENDOR. Minimum roof live
load approximately 20 lbs./ft.2 The roof wall
covering shall be designed for the ambient temperature range of -1°C to 40°C
and internal temperature of 18°C to 30°C. 1.8
Uninterruptible Power Supply (UPS)
Systems
The UPS systems
shall be supplied by the TMS VENDOR in accordance with Section 7.12. Each UPS shall be installed and wired in the
SIB by the TMS VENDOR. See Figure 3 and 4 for the simplified one line diagram. The TMS VENDOR shall determine the location,
the kVA capacity and wiring connections.
Electrical load figures for equipment not supplied by the TMS VENDOR
shall be supplied by HVACMEP.WEBSITE. 1.9
Auxiliary Equipment
Auxiliary Equipment
power supply shall be 220/127 VAC or 208/120 VAC, three phase, 4-wire system
fed from the Main Distribution Panel located in the SIB. See Figure 3 for the simplified one line diagrams.
Note that these figures are typical only and the TMS VENDOR shall design
the electrical power distribution in accordance with the site specific drawings
as supplied for each site. |