LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,

 LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 


LANDSCAPE IRRIGATION SYSTEM

 

 

PART one - GENERAL

 

1.1          DESCRIPTION of labor

 

  A.          The add this Section includes the landscape irrigation system.

 

  B.          connected Work:

 

                Section 02200    Earthwork

                Section 02480    Landscape Planting

                Section 02481    Warranty and Maintenance of Irrigation Systems and Plant Materials

                Section 02622    Plastic Pipe ( PVC )

                Section 02713    Water Distribution Systems

                Section 03300    Cast-In-Place Concrete

                Section 16010    General Provision for craft

 

1.2          QUALITY ASSURANCE

 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 

  A.          printed specifications, standards, tests or counseled strategies of trade, trade or governmental organizations apply to figure of this section wherever cited by abbreviations noted below.

 

                1.            yank National Standards Institute (ANSI).

 

                2.            yank Society for Testing and Materials (ASTM).

 

                3.            Owner Electrical Code (RCEC).

 

                4.            National Electrical makers Association (NEMA).

 

                5.            Underwriters Laboratory (UL).

 

                6.            Owner branch of knowledge Code (RCAC).

 

 B.           Reference Standards:

 

                Sponsor Number             Subject

 

ASTM D1784       Rigid PVC (PVC) Com- pounds and Chlorinated PVC (CPVC) Compounds.

 

ASTM D1785       Polyvinyl Chloride (PVC) Plastic Pipe, Schedules forty, 80 and 120.

 

ASTM D2287       Non-rigid Vinyl Chloride chemical compound and polymer Molding and Extrusion Com- pounds.

 

ASTM D2464       Threaded PVC (PVC) Plastic Pipe Fittings, Schedule eighty.

 

ASTM D2466       Socket-Type PVC (PVC) Plastic Pipe Fittings, Schedule forty.

 

ASTM D2467       Socket-Type PVC (PVC) Plastic Pipe Fittings, Schedule eighty.

 

AWWA C701       Standard for Cold Water Meters - rotary engine kind for client Service.

 

                NEMA FB 1                          Fittings and Supports for passage and Cable Assemblies.

 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 

                Nepa 70-310-11 Conductors for General Wiring - Markings.

 

SAS fourteen and 15       Pipe and strategies of take a look at for Potable Water of Un-plasticized Pipe (UPVC).

 

                UL-6                                       Rigid Non-Metallic passage.

 

  C.          Testing and Inspecting:

 

1.            Tests and Inspections:  The Contractor shall schedule and perform all tests and inspections needed. prices of all tests and inspections and prices of retests of rejected work shall be borne by the Contractor.

 

2.            Filling, backfilling, and compaction shall be per- fashioned to satisfy the approval of the Owner as per Section 02200 "Earthwork."

 

3.            go with "Cast-In-Place Concrete" Section 03300 for pits and thrust blocks.

 

  D.          Layout of the Work:  The Contractor shall be to blame for the accuracy of all layout work and shall retain and buy the services of a commissioned surveyor to line the lines and grades for all construction.

 

1.3          SUBMITTALS

 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association

  A.          Manuals: before the ultimate review of the irrigation system, the Contractor shall furnish manuals, to the Owner.  The manuals shall contain complete exploded read drawings, diagrams and spare elements lists of all instrumentality put in showing elements and catalog numbers. additionally, every service manual shall contain the following:

 

1.            Index sheet indicating the Contractor's name, address, and signaling.

 

2.            Copies of apparatus warranties and certificates.

 

3.            List of apparatus with names, addresses, and phonephone numbers of native manufacturer's representatives.

 

4.            Complete operational and maintenance directions in decent detail to allow operational personnel to know, operate and maintain all instrumentality put in.

 

5.            Paint and protecting coatings shall be pictured by sample labels (containing name or title of materials, manufacturer's stock range, manufacturer's name and contents by volume, for major pigment and vehicle constituents similarly as dilution and application instructions).

 

  B.          look Drawings: look drawings for the subsequent irrigation system elements square measure required:

 

1.            Preparation of layouts of secondary and tertiary lines showing FCM, RCV positions and tag numbers, and totally coordinated dimensioned piping layouts beside layouts one-line diagrams or schedule of all electrical management cables. the ability cables to FCM's shall be shown on the power/lighting electrical drawings.  All wind and tertiary distribution softline shall be shown as way because the last sprinkler/emitter on every branch. For emitters, the particular positions of each the soft lines and electrode points shall be shown in reference to the particular positions of individual trees, shrubs and groundcover plants.  The nominal sizes and internal diameter of all wind shall be indicated.  Flush points, road crossings and sleeve locations shall be indicated.

 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 

2.            Irrigation controller with internal schematic, schematic, bill of fabric for field management module, pedestal, sign layout and concrete pad.

 

3.            Boxes to incorporate all internal elements and assemblies of elements.  Indicate all box dimensions comprehensive of lid configuration, closing and protection hardware, and lid title.

 

  C.          Materials List:

 

1.            In period of time set forth by the Owner, the Contractor shall submit copies of an entire list of materials planned for installation to the Owner for approval.

 

2.            The list shall embrace the item range, size and outline of the fabric, the manufacturer and model range, and marque as applicable.

 

3.            Paint and protecting coatings shall be pictured by sample labels containing name or title of fabric, manufacturer's stock range, manufacturer's name and contents by volume, for major pigment and vehicle constituents similarly as dilution and application directions.

 

LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association,
LANDSCAPE IRRIGATION SYSTEM, Landscape Planting, Plant Materials, Water Distribution Systems, Cast-In-Place Concrete, General Provision for Electrical Work, abbreviations, American National Standards Institute, American Society for Testing and Materials, Owner Electrical Code, National Electrical Manufacturers Association, 

  D.          Samples (See Section 01340):

 

                All of the subsequent needed samples for irrigation system elements shall be submitted along in one package submittal.  Separate submittals don't seem to be acceptable.

 

1.            Plastic pipe and passage, electrode distribution hose and electrode outlet conduit, 600 millimeter (2 ft) length of every size and kind.

 

2.            one among every valve box lid with inscriptions in Arabic and English (see Paragraph a pair of.5B).

 

3.            management wire, 600 millimeter (2 ft) length of every color, with schedule of color description.

 

4.            protection packet for waterproof management wire splices.

 

5.            Plastic fittings, one among every material kind (one size only).  Drip lateral fittings, one among every kind for every pipe size.

 

                6.            management valves of every kind complete with coil valve assembly.

                7.            Controller chart, one typical.

 

                8.            Drip emitters, one among every kind planned to be used.

 

                9.            flow preventer

 

                10.          Signs, one typical.

 

11.          Submit samples of paint and protecting coatings for review of color and texture solely. give a list for the fabric and application for every coat of every end sample.  On three hundred millimeter x three hundred millimeter (12 in. x 12 in.) chipboard, give 3 samples of every color and material, with texture to simulate actual conditions. render every sample as requested till the desired effulgence, color and texture is achieved.

 


Saturday, November 28, 2020

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE, METHODS FOR SAMPLING AND TESTING OF MINERAL AGGREGATES, SANDS AND FILTERS, WAYS FOR TESTING SOILS FOR TECHNOLOGY FUNCTIONS


SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, 

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY,
SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE, METHODS FOR SAMPLING AND TESTING OF MINERAL AGGREGATES, SANDS AND FILTERS, WAYS FOR TESTING SOILS FOR TECHNOLOGY FUNCTIONS


SUB GRADE AND ROAD BASE

PART one – GENERAL

1.1          DESCRIPTION

This section covers the specification, trimming, compaction, protection, reconditioning and testing of subgrade and roadbases before the appliance of ulterior construction layers.

1.2          SECTION INCLUDES

This section covers the furnishing of materials, instrumentality and labour for excavating, trimming, wet learning, protection, dirt management and compaction of sub grades and road bases. 

1.3          RELATED SECTIONS

02200    Earthwork          

1.4          RELATED OBLIGATIONS

A.            the final necessities below Division one apply to figure per the section.

B.            The Contractor shall examine all different sections of the specification for necessities which can have an effect on work of this section.

C.            The Contractor shall coordinate work with all different trades touching or stricken by activities of this section. get together with such different trades to assure the steady progress of all operations below the Contract

1.5          APPLICABLE CODES AND STANDARDS

The following codes and standards square measure meant to produce a suitable level of quality because the documented codes and standards to be submitted by the Contractor to the Owner for approval ahead of their use.

ASTM    American Society for Testing and Materials

D 422     Particle Size Analysis of Soils

D 423     Liquid Limit of Soils

D 424     Plastic Limit and malleability Index of Soils

D 1556   Density of Soil in situ by the Sand-Cone methodology.

D 1557   Moisture Density Relations of Soils and Soil-Aggregate Mixtures mistreatment ten pound. (4.54 kg) ram and eighteen in. (457mM) Drop Tests.

D 2049   Relative Density of Cohesionless Soils

D 2167   Density of Soil in situ by the Rubber-Balloon methodology

D 653     Definition of Terms and Symbols about Soil and Rock Mechanics

BSI          British Standards Institute.

BS 812   Methods for sampling and testing of mineral aggregates, sands and filters.

BS1377  ways for testing soils for technology functions.

BS6031  Code of apply for Earthworks

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE,


1.6          SUBMITTALS

A.            methodology STATEMENT AND PROGRAMME

The Contractor shall give the Owner with the subsequent information:

a.            methodology STATEMENT: shall embrace planned excavation and compaction plant, methodology of excavation, filling and compaction, methodology of treating slopes, protection of formations, etc.

b.            PROGRAMME OF WORKS: a minimum of fourteen days before the beginning of the Works. 

1.7          QUALITY management

A.            REPORTING

INSPECTIONS AND APPROVALS

The Contractor shall befits any necessities of relevant native authorities concerning the notification, review and approval of all excavations and formation levels.  The Contractor shall keep dated records of the inspections and any directions, that end in the outlined limits of the excavation being exceeded.

The Contractor shall offer the Owner AN united amount of notice of the time every formation level are going to be exposed in order that the Owner could, if he therefore needs, examine the formation. this era shall be a minimum of twenty four hours.

The Contractor shall maintain, and replica to the Owner occasionally to be united, full records of notices, inspections, and therefore the time of formation exposure before covering up.

The Contractor shall maintain a professional representative on-the-scene throughout all earthworks operations. Weekly internal control Report are going to be equipped to the Owner summarising the following:

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE,


a.            Daily review reports

b.            Soil check results together with relative compaction (from previous week’s samples)

c.             Water quality tests

d.            Samples taken on (and quantity of labor painted by every individual sample)

e.            internal control performance

f.             A Monthly internal control Report are going to be equipped to the Owner summarising the following:

g.            Weekly internal control report

h.            management charts (showing previous sixty days aforethought check results/control measure, etc.).

i.              planned internal control programme enhancements, if acceptable.

j.             Revisions to frequency of testing

k.            Work suggested for acceptance

The Owner shall approve the monthly internal control Report before being admit table as a contract record.

B.            SETTING OUT

The Contractor shall give full time dedicated surveyors and technicians to undertake measure and for the presentation of results.  The Contractor can give curricula vitae of key personnel together with the pinnacle surveyor and technicians. If the Owner believes for any reason that any of the personnel square measure unsuitable the Contractor shall take away them from web site and quickly realize a replacement. 

The Contractor shall establish a top quality assurance procedure to internationally recognized standards so as to assure the accuracy of the popping out and quality of the data. A freelance company approved by the Owner shall undertake monthly audits. Audit reports are going to be issued on to the Owner.

All plans and cross sections shall be bestowed to the Owner in AutoCAD 2006 dwg format.  Access to the digital records are going to be needed in any respect time by the Owner.  The Contractor shall agree the format of drawings and therefore the system of digital documentation management with the Owner.

 

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE,

 

PART two – product

2.1          DEFINITIONS

A.            FORMATION

Formation shall mean the surface of the bottom once completion of any excavation or filling operation.

PART three - EXECUTION

3.1          FORMATIONS

A.            PROTECTION

To avoid injury to excavation formations, excavation surface shall be left a minimum of 150mm on top of formation level till like a shot before being offered for review. Oozing and water shall be unbroken off the works as nominal.

Construction plant and different traffic shall not be operated on the formation, aside from that needed for preparation of the formation, unless adequate protection is provided.  The Contractor's proposals for making ready the formation and particularly however he intends to traffic it shall be united with the Owner.

If any square measures of formation are broken by the weather or the other cause the Owner shall be like a shot notified.

The Contractor shall not permit any formation to be left exposed for over four hours once being uncovered.

B.            PREPARATION

All formations shall be cut, levelled, cleared of loose material and compacted, in accordance with the Specification, prepared for review. 

After removal of any protection layer and unless otherwise directed, road formations shall be now compacted in accordance with this Specification. Before installation of A1a appropriate fill, material is to be compacted or existing subgrade to be compacted to needed elevation. The compaction technique shall, for this purpose, be assumed to be as for a layer of 300mm finished thickness compacted in compliance with this Specification.

Immediately when this compaction, the formation shall be cut to attain the desired tolerances.

After trimming, or re-trimming if necessary, the formation shall be rolled with a minimum of 1 pass of a smooth-wheeled roller having a mass per meter dimension of roll not but 2100kg, or, a vibrating roller having a mass per meter dimension of not but 700kg or a moving plate compactor having a mass per m² below the bottom plate of not but 1400kg. The primary layer of building shall cowl it now when review.

3.2          DUST management

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE,


The Contractor shall

a.            Use all means that necessary throughout the world of the location below the occupation of the Contractor to regulate dirt on and close to the work and on and close to all borrow areas.

b.            completely moisten all surfaces pro re nata to stop dirt being a nuisance or a hazard to the occupants of the prevailing properties, and to the general public and synchronous  performance of alternative work on website. 

3.3          CONTROL OF WATER

The Contractor shall:

a.            Keep all work well drained in the slightest degree times and make sure that all work is meted out in unsaturated conditions in accordance with the “Method Statement” for the management of water as ready and suggested by the Contractor and approved by the Owner.

b.            Construct, operate, and maintain wells, sumps, pumps, relief well systems, evacuation channels, pipelines and culverts, necessary for excluding water from the work to confirm stability of excavations, whereas construction is ongoing.  Such temporary works and plant shall embrace spare units unbroken prepared for immediate use just in case of breakdowns, and shall not be removed while not the approval of the Owner.  All pipelines, culverts and instrumentality not toward land within the possession of the Contractor shall be fitly designed for Construction traffic.

c.             create provision for the discharge or disposal from the work of all water and waste product howsoever arising and supply temporary pipes, flumes or channels. 

The Owner reserves the proper to direct the Contractor to put in, operate and maintain evacuation, pumping systems and well systems whenever, within the opinion of the Owner the ways getting used by the Contractor to regulate water area unit inadequate, nonetheless any previous acceptance of such ways.  No extra payment shall be created for evacuation systems put in, operated and maintained at the direction of the Owner.

 

 

SUB GRADE AND ROAD BASE, APPLICABLE CODES AND STANDARDS, AMERICAN SOCIETY FOR TESTING AND MATERIALS, PARTICLE SIZE ANALYSIS OF SOILS, LIQUID LIMIT OF SOILS, PLASTIC LIMIT AND MALLEABILITY INDEX OF SOILS, DENSITY OF SOIL IN SITU BY THE SAND-CONE METHODOLOGY, MOISTURE DENSITY RELATIONS OF SOILS AND SOIL-AGGREGATE MIXTURES MISTREATMENT TEN POUND. (4.54 KG) RAM AND EIGHTEEN IN. (457MM) DROP TESTS, RELATIVE DENSITY OF COHESION LESS SOILS, DENSITY OF SOIL IN SITU BY THE RUBBER-BALLOON METHODOLOGY, DEFINITION OF TERMS AND SYMBOLS ABOUT SOIL AND ROCK MECHANICS,BRITISH STANDARDS INSTITUTE,

 

3.4          TESTING

Testing of formations shall be meted out in accordance with section 02315.

3.5          TOLERANCES

The permissible deviations of the formation levels as outlined during this Specification from the positions shown or determinable from the drawings and with regard to the closest information level shall be as follows:

PERMISSIBLE DEVIATIONS OF FORMATION LEVEL

Beneath road and parking lot construction           + 20mm - 30mm mound and cutting slopes and pedestrian footways (unsurfaced) ± 50mm.

Thursday, November 26, 2020

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

 SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC
SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC


SOIL TREATMENT FOR white ant management

 

 

PART one - GENERAL

 

1.1          DESCRIPTION of labor

 

  A.          The work of this section includes pre-construction soil treatment for preventive management of subterranean termites in buildings.

 

  B.          The scope of labor includes however isn't restricted to the procurance of all materials when acceptable approval by the Owner, temporary storage consistent with the manufacturer's recommendations, excavation and alternative necessary website preparation, application of answer, sampling and testing, safety, disposal of venturous waste, and close up of space propaedeutic to any construction.

 

1.2          SUBMITTALS

 

  A.          Submit makers technical knowledge sheets for materials and specific application directions for review and approval before commencement of the work.

 

1.3          QUALITY ASSURANCE

 

  A.          applier Qualifications

 

soil-treatment-for-termite-control-inspection-and-test-plan-soil-termiticide-treatment-white-ant-termite-infestation-bifenthrin-based-supplier-emulsible-dilutes-low-human-toxicity-low-odour-no-skin-irritation-low-vapor-pressure-wont-hang-around-your-building-emulsible-harmful-pesticide-sprayer-antecedently-synthetic

1.            The work of this section shall be performed by a contractor certified by the Ministry of Agriculture in tormentor management with a minimum of 5 years expertise in similar work.  Qualifications of the applier shall be submitted for review and approval by the Owner.

 

  B.          review and check set up

 

1.            Submit for review and approval a Soil Treatment review AND check set up (ITP) reflective the wants of those specifications and approved submittals before commencement of construction.

 

2.            The ITP shall address sequence, methodology and management of application and criteria for acceptance of labor.

 

3.            The ITP shall embody procedures for sampling and testing of the soil by chemical extraction to see the content of the termiticide answer residual within the soil before and when treatment. The results of those tests shall represent the management sample.  Sampling Associate in Nursingd testing shall be done by an freelance Testing Laboratory approved by the Owner.

 

4.            The Contractor shall submit a layout of the world to be treated counteracted into individual check AREAS. check AREAS shall be restricted to the world for every kind of check listed below, and area unitas that aren't contiguous to and are separated from alternative spaces aren't to be combined for check area calculations. every check space shall have sample and check locations chosen by the Owner Representative and indicated on the layout when treatment and before testing.

 

5.            Sampling Associate in Nursingd testing of every check space shall be performed by an freelance check Laboratory as follows:

 

a.            one check per every 250 square metre space beneath the block on grade.

               

b.            one check per every fifty square metre space of vital areas beneath the block on grade.

               

c.             one check per seventy five linear meters per thirty cm elevate at perimeter of concrete and/or solid masonry unit footings and foundations.

 

6.            If any initial check fails, 3 further retests shall be taken within the same check space, at locations directed by the Owner.  If any of the 3 retests fail, the complete check space, shall be people and retested in compliance with this specification and also the approved ITP.  If all 3 tests pass solely the situation of original failure shall be people and retested.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

7.            The Contractor are allowed the choice to entirely or partly retreat the check space between initial tests and retests beneath the observation of the Owner.  Such retreatment won't preclude any retreatment needed by this specification within the event of unsuccessful results when retesting.

 

8.            The ITP shall need a written technical proposal for preparation and check ways of management samples from the categories of fabric to be treated.  The management samples shall be ready and tested by the freelance Laboratory beneath the observation of the Owner.  The check results obtained from the treated management samples shall be the idea for acceptance or rejection of the work. the factors for acceptance is as follows:

 

a.            Any initial check result that is a smaller amount than ninetieth of the results of the individual management sample shall be thought of to fail.

               

b.            Any retest result that is a smaller amount than ninety fifth of the results of the individual management sample shall be thought of to fail.

 

1.4          SAFETY

 

  A.          The Contractor shall post warning signs in Arabic and English in areas of application to tell staff and also the public that venturous soil treatment (poison) has been applied. take away signs only treated area unitas are adequately lined by concrete.

 

  B.          The Contractor shall treat all empty containers and alternative contaminated materials as venturous waste and properly dispose in selected areas.  Keep all such waste in one space, marked as venturous (poisonous) material till it are often properly disposed. don't enable such material to become mixed into alternative trash or waste materials.

 

  C.          staff shall wear protecting article of clothing and alternative equipment counseled by the manufacturer.

 

  D.          additionally to necessities listed, the Contractor shall go with all safety recommendations created by the manufacturer or needed by the Owner.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

1.5          WARRANTY

 

  A.          The Contractor shall furnish a written pledge certifying that the applied soil termiticide treatment can stop infestation of subterranean termites for a amount of 10 (10) years from the date of initial acceptance, signed by the Contractor and also the applier.

 

  B.          The pledge shall need the Contractor to produce further treatment if there's any proof of white ant infestation throughout the pledge amount. further treatment are applied in compliance with Owner specifications for post-construction white ant treatment.

 

  C.          The pledge shall additionally need the Contractor to repair to the satisfaction of the Owner or furnish equal or higher replacements for injury caused by white ant infestation throughout the pledge amount.

 

PART two  - merchandise

 

2.1          MANUFACTURER

 

A.            planned product: Subject to compliance with native laws and necessities merchandise that will be incorporated within the work embody , however not restricted to the following:

 

1.            Biflex T.C. :- Bifenthrin based mostly

Supplier:             

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

2.            Or approved equal.

2.2          MATERIALS

 

A.            General: Use AN emulsible, focused termiticide that dilutes with water, specially developed to stop termites infestation and will not cause pollution   to the setting or toxity to the plantation. fuel shall not be permissible diluents. Offer an answer consisting of 1 of following chemical

 

 

 

 

B.        Environmental friendly product.   

 

1. Low human toxicity .

2. Low odour .

3. No skin irritation .

4. Low pressure .

5. Won’t lurk around your building.

 

C.            toxic chemicals, E.P.A. and native territorial authority approved.

 

SOIL TREATMENT FOR TERMITE CONTROL INSPECTION AND TEST PLAN, WHITE ANT, SOIL TERMITICIDE, TREATMENT TERMITE, INFESTATION, BIFENTHRIN BASED SUPPLIER, EMULSIBLE, DILUTES, LOW HUMAN TOXICITY, LOW ODOUR, NO SKIN, IRRITATION, LOW VAPOR PRESSURE, WON’T HANG AROUND YOUR BUILDING, EMULSIBLE, HARMFUL, PESTICIDE SPRAYER, ANTECEDENTLY, SYNTHETIC

D.            Dilute as suggested by the toxic manufacturer and approved by the E.P.A. and native territorial authority and S.A.S.O.

 

E.            Certify that toxic can don't have any harmful result on water proofing membranes, coatings and alternative contact materials.

 

PART three - EXECUTION

 

3.1          APPLICATION GENERAL

 

  A.          All application shall go with the manufacturers’ recommendations as enclosed within the approved ITP.  Application shall be created with an occasional pressure power sprayer or a tank sort compression pesticide sprayer.

 

  B.          don't apply soil treatment answer till excavating, filling and grading operations area unit completed, except as otherwise needed in construction operation.  Reapply soil treatment answer to areas disturbed by construction operations following application of soil treatment termiticide answer.

 

  C.          The Contractor shall make sure that no wood or wood product area unit left within the fill.

 

  D.          take away all foreign matter that might decrease effectiveness of treatment on areas to be treated. Loosen, rake and level soil to be treated, except antecedently compacted areas beneath slabs and foundations.  If concrete slabs cannot be poured over soil a similar day it's been treated, a water-resistant cowl of synthetic resin material shall be placed over the treated soil.  Concrete shall be placed as shortly once soil treatment as potential. Sampling and testing shall be administered promptly to expedite putting of concrete.

 

  E.          Application of termiticide answer should be administered in such a way on offer AN unbroken vertical and horizontal chemical barrier between the structures connected with the soil and white ant colonies within the soil.

 

3.2          APPLICATION LOCATION AND RATES

 

  A.          beneath block on grade within foundation walls: wherever fill is well stratified soil, apply four liters of termiticide answer per one sq. meter of soil. wherever fill material is washed gravel or alternative coarse sorbent material, apply six liters of termiticide answer per one sq. meter of soil.

 

  B.          At important area unitas beneath the concrete block on grade within the building line:  Areas enclosed are the within perimeter of foundation walls, each side of interior partition walls on grade beams, the perimeter of column footings, construction joints or enlargement joints in slabs, the perimeter of plumbing pipes, electrical conduits or alternative block penetrations. the world of treatment shall be thought-about to increase a minimum of twenty cm on the far side these locations.  Apply twenty five liters of termiticide answer per centare of soil.

 

  C.          At concrete and/or solid concrete masonry unit footings and foundations: space of treatment shall be thought-about to increase a minimum of twenty cm outside the perimeter of the building line.  Apply five liters of termiticide answer per linear meter of trench to every thirty cm carry from bottom of footing to prime of end grade on the whole outside perimeter of the inspiration.  For foundations but thirty cm deep, a minimum depth of thirty cm from prime of end grade shall be treated.  Termiticide answer could also be mixed with the fill soil because it is placed within the trench excavation or sprayed onto the fill layer of a most thirty cm carry before compaction.

 

  D.          At hollow core concrete masonry unit foundations: additionally to the treatment higher than for footings and foundations treat voids at a rate of eight liters of termiticide answer per linear meter of foundation wall, sprayed into the hollow areas.

 



Wednesday, November 25, 2020

ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS,

 ROADWAY BASE

ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL
ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL 

1.1 DESCRIPTION of labor


  A. The extent of the work includes the availability, spreading and compacting of road base in compliance with the specifications and in conformity with grade, lines and thickness shown on the drawings.


  B. the planning shall be supported the wants of AASHTO HS20-44 hundreds for the community space and Ministry of Transport (MOT) truck wheel hundreds for the economic areas.


  C. connected Work:


1. Section: Earthwork

2. Section: Asphalt Concrete Paving



1.2 QUALITY ASSURANCE


  A. verify the situation, suitableness, and amount of materials obtainable for the provision of the granular base.


B. Perform the mandatory tests and submit reports to the Owner for approval before its transportation to the positioning.


C. Mineral material for road Base ought to usually befits the present edition of following commonplace specification:


ASTM Designation:


D 2940 Standard Specification for stratified Material for Bases or Subbases for Highways or Airports


AASHTO Designation:

ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL
ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL 



M 147 Materials for mixture and Soil-Aggregate molding, Base, and Surface Courses

PART two – merchandise


2.1 ROADWAY BASE (GRANULAR BASE COURSE)


  A. General:  Sound present material, or angular crushed stone, clean and free from organic matter and unsuitable material or different injurious substances and in such condition that it will be without delay compacted beneath watering and rolling to create a firm and stable base.


  B. necessities (Perform the subsequent each a thousand conductor m):  Gradation necessities of the road base material, once tested in accordance with ASTM C136 shall be as follows:



Sieve Size Base Material Designations and Nominal

Maximum Size of mixture

Metric,     

mm SAE, 

in 25.0 mm 19.0 mm

37.5 100 -

25.0 1.0 77-94 100

19.0 ¾ 65-87 85-96

12.5 ½ 50-76 66-86

9.5 3/8 43-70 57-79

4.75 No. 4 29-56 39-63

2.36 No. 8 20-45 27-48

1.18 No. 16 14-35 18-36

0.60 No. 30 10-26 12-27

0.30 No. 50 7-19 8-20

0.15 No. 100 5-14 5-14

0.075 No. 200 3-10 3-10


C. different Requirements:

Liquid Limit ASTM D423 most twenty five

physical property Index ASTM D424 Maximum six

Resistance to Abrasion, % ASTM C131 Maximum fifty

CBR, % ASTM D1883 Minimum fifty


D. Gradation of the road base material shall have Associate in Nursing “S-shaped curve” that plots higher than the utmost density line (MDL) for the and four.75 millimetre fraction and below the MDL for fine fraction. additionally, it's counseled to be outside of the “restricted zone”.  Gradation is allowed to undergo the “restricted zone” if there's a history of thriving performance or supporting take a look at results. 


PART three – EXECUTION


3.1 SUBGRADE examination & APPROVAL

ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL
ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL 


  A. The Contractor shall examine the subgrade elevations, grade, tolerance, dimensions, compaction and also the conditions beneath that the road base work is to be performed and proper any unsatisfying conditions instantly before putting base materials.


  B. don't proceed with the work till unsatisfying conditions are corrected in a very manner acceptable to the Owner.


3.2 PLACING OF road BASE AND SHOULDER MATERIAL


  A. Deliver road base and shoulder material as the same mixture and place on the road and shoulder bed by suggests that of controlled mechanical spreader, and at the same amount per linear meter and at a rate which is able to give given|the desired} compacted thickness specified.  Avoid segregation of fabric and material not uniform in mixture.


  B. Place material in compacted layers of roughly equal thickness. Unless otherwise approved, thickness isn't to exceed a hundred and fifty millimetre for anybody layer. once placed in two or a lot of layers, allow initial layer to dry simply sufficiently for stability throughout putting of the next layer. allow the finished base to dry simply sufficient  for stability throughout putting of any building material.


3.3 COMPACTING AND GRADE TOLERANCE

ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL
ROADWAY BASE, EARTHWORK, ASPHALT CONCRETE PAVING, DETERMINE THE LOCATION, NECESSARY TESTS, GRANULAR BASE, ASTM DESIGNATION GRADED MATERIAL, AASHTO, SOIL-AGGREGATE, SUBBASE, ROADWAY BASE GRANULAR BASE, COURSE ANGULAR, CRUSHED STONE, DELETERIOUS SUBSTANCES, COMPACTED LIQUID, LIMIT PLASTICITY INDEX, RESISTANCE TO ABRASION, SUBGRADE INSPECTION & APPROVAL 


  A. Compaction:  Compact road base and shoulder, and each layer thence to not but 100% of most density in accordance with ASTM D1557, Method D. take a look at density of compacted base in accordance with ASTM D2167 or ASTM D 2922 or ASTM D1556.  Conduct one take a look at for every 2000 sq m of in-place material, however in no case but 3 tests daily for every layer.  Perform ASTM D1557 once for each ten field density tests of ASTM D1556, ASTM D 2922 or ASTM D2167.


  B. Grade Tolerance:  The surface of the finished base shall not vary by over + ten millimetre once tested with a 3-meter hand tool and once placed on, and parallel or perpendicular to the middle line of the road and also the compacted base shall not vary by over + ten millimetre from the desired elevation.  Correct all depressions and humps surpassing the required tolerances.